Concept · sample data

Build plan

Phases 0–8, owners and estimated weeks.

Wk 0Wk 4Wk 8Wk 12Wk 16Wk 20Wk 2426+
0 · Decide and confirm
1 · Buy one CR5400 and bench test
2 · Scanner integration service
3 · Register UI
4 · Barcode age check live
5 · Own AI forensic engine
6 · Hub side
7 · AWS test, test store pilot, approval
8 · Rollout state by state
  1. 0

    Decide and confirm

    Leadership, backend lead, legal counsel · 1-2 wks · Wk 0–2

    Get Thales SDK terms in writing (free, no royalties, own AI allowed), confirm Windows 11 driver, start legal review of patents and MA privacy rules, set priorities.

  2. 1

    Buy one CR5400 and bench test

    Backend lead · 1-2 wks · Wk 2–4

    Install on the HP station, capture test cards under all three lights both sides, time scans, check USB stability.

  3. 2

    Scanner integration service

    Backend lead · 3-4 wks · Wk 4–8

    Wrap the Thales SDK, parse AAMVA PDF417 (DOB, expiry, state, ID number), local API for the register, clean fallback if unplugged/jammed.

  4. 3

    Register UI

    Frontend lead · 3-4 wks · Wk 6–10

    Scan ID prompt, checking state, pass/fake/under-21 screens, payment gate, logged manager override.

  5. 4

    Barcode age check live

    Backend + frontend leads · ~2 wks · Wk 10–12

    21+ from barcode, expiry, barcode vs front match.

  6. 5

    Own AI forensic engine

    Backend lead (AI), legal counsel for data · 12-16 wks, in parallel · Wk 4–20

    Legal data collection, MA template library, train UV/IR/template/microprint/ghost/barcode-vs-front/tamper checks, accuracy targets set by leadership, offline model on the station.

  7. 6

    Hub side

    Frontend + backend leads · 3-4 wks · Wk 8–12

    Verification log, settings, device health, add-on enablement per store.

  8. 7

    AWS test, test store pilot, approval

    Leadership sign-off · 4-6 wks · Wk 12–18

    Separate AWS test environment, pilot at the test store, leadership sign-off.

  9. 8

    Rollout state by state

    Leadership · ongoing · Wk 18–26+

    Massachusetts first, then add states as each state's model passes testing.

Decisions needed

All durations are planning estimates; leadership sets the real schedule.